Four Levers, One Building: The IEA's 25 % Plan Drawn as a Section
The IEA's buildings report splits a 26 % energy-intensity cut into equipment, envelope, heat pumps and clean cooking. Equipment, not the wall, leads.
The International Energy Agency has written a climate target the way an engineer writes a heat-loss calculation: as energy per unit of building. Its Special Report on Buildings Efficiency, published in early November 2026, maps how the world could cut building energy-consumption intensity by at least 25 % by 2035. The target is proposed by the COP31 Presidency and is not yet an adopted COP decision. The report itself was, in the IEA’s words, “developed at the request of Türkiye and Australia”. It is a rare piece of planetary accounting that you can draw as a building section.
Per the IEA, buildings take about 30 % of total final energy consumption and half of global electricity, and they emit 2.8 Gt of direct CO2. Intensity has improved by about 1 % a year this decade. Under today’s policies it falls only 7 % against 2025 by 2035. The IEA pathway reaches 26 %, so the annual rate has to more than double. The agency calls this “achievable with technologies and policy measures already available.” No new physics is required, only scaling the physics we already have.
The stacked bar
Split the 26 % into its four layers and the largest one is not the wall.
- Equipment, 40 %: the plant room and the socket. About 140 countries regulate appliance efficiency. 118 of them set minimum performance standards (MEPS) for air conditioners, covering over 90 % of cooling demand. Some markets accept units less than half as efficient as units other markets allow. The leverage sits in that standards gap.
- Envelope, 20 %: the wall build-up. 102 countries have mandatory building energy codes, yet only around 60 % of new buildings worldwide comply with one.
- Electrification, 15 %: the heat source. Heat pumps are “typically three to five times more efficient than fossil fuel boilers,” per the IEA. Installed capacity triples by 2035, and space-heating intensity falls by nearly 35 %.
- Clean cooking, 25 %: the kitchen. Nearly 2 billion people still cook without clean fuels. The pathway extends clean cooking access to more than 1,750 million people by 2035. This layer is a health gain first and an energy statistic second.
A COP of 3.5 is not a design flourish. It is a thermodynamic ratio: heat moved divided by work spent, set by the temperature lift. That ratio is why the electrification layer weighs so much for its size.
A global bar also flattens the globe, the way a Mercator map does. Earth’s 23.44° axial tilt, whose direction precesses over roughly 25,800 years, leaves the winter noon sun in Zürich at 47.4°N only about 19° above the horizon. There the heat source dominates the bar. Nearer the tropics the air conditioner does. The same four levers take different proportions at every latitude.
←TODAY: 102 countries have building energy codes, yet only about 60 % of new buildings meet one. →3012: Every building’s energy intensity sits in its model as a live number, specified like steel grade. Fulcrum: The biggest lever is the equipment schedule, the line item planners touch last and could touch first.
The invisible people under this report are the test-lab technicians and standards committees who measure seasonal efficiency, unit by unit, so that a MEPS line means something. Without their measurements, the 40 % layer would be a wish. Swiss practice shows the layers working together: SIA 380/1 for the envelope, Minergie for the whole, the heat pump as the default heat source. PAZ followed lake water as a cooling and heat-network source in our piece on Swiss lakes at record lows.
The IEA puts investment at more than USD 370 billion in 2025, rising to nearly USD 1.2 trillion a year by 2035. Here is the trade-off, stated plainly. Tripling heat-pump capacity moves load onto grids where buildings already use half of all electricity. Unless the equipment layer improves alongside it, electrification simply shifts the peak.
Atelier: For a Zürich studio deep in Ausführungsplanung, this ranking makes the equipment schedule a design document rather than a hand-off to the HVAC engineer. An AI assistant drafting specifications will repeat whatever efficiency class the template holds. Monday move: add a mandatory “efficiency class / SCOP / SEER” column to the equipment schedule in your Archicad template, and leave no row blank.
Hack: Rank your project’s installed systems by the final energy they draw, not by their label, so you know which one to replace first. Divide each delivered service, in kWh of heat or cold, by its efficiency, and the weakest system rises to the top. The script runs unchanged in a GhPython component in Rhino. The values are placeholders, so swap in your project’s figures.
spec = {'space heat: gas boiler': (40000, 0.92), 'hot water: electric tank': (8000, 0.98), 'cooling: split unit': (6000, 3.2)}
final = {k: q / eff for k, (q, eff) in spec.items()}
for k in sorted(final, key=final.get, reverse=True): print(k, round(final[k]), 'kWh/yr')
print('swap boiler for heat pump at COP 3.5, saves', round(final['space heat: gas boiler'] - 40000 / 3.5), 'kWh/yr')
print('IEA pathway rate per year:', round((1 - 0.74 ** (1 / 10)) * 100, 1), '%')The last line is the 26 % pathway compounded: about 3 % a year, against today’s 1 %. That gap is what your equipment schedule is being asked to close.
Open your current project’s equipment schedule today, find the system with the worst efficiency class, and rewrite that one line in the spec.
Sources & Further Reading