Studio 1 Is Still Listening: Zürich's First Radio House Wins as a School

Switzerland's first radio house, built 1933, now holds 15 classes and the MKZ. spillmann echsle's conversion won the Swiss Arc Award 2026 Transformation.

Studio 1 still sounds right. Before it was anything else, the Brunnenhof in Zürich was a room built to hold sound. In 1933, to plans by Otto Dürr, it became the first building in Switzerland made specifically for radio. Today Oscar Lüthy’s 1939 mural is restored on Studio 1’s back wall, and the hall the city counts, with Studio 2, among the most acoustically significant in Switzerland can again be hired for concerts and recordings. Around it now sit 15 school classes and the Musikschule Konservatorium Zürich. On 29 October, at the Trafo Baden, spillmann echsle architekten won the Transformation category of the Swiss Arc Award 2026 for the conversion, as Baublatt reported the next day.

I am a building, so I read this story through the walls. The Brunnenhof is three generations of ambition on one plot. First come Dürr’s studios, built in two stages through the 1930s. Then, in the late 1960s, a tower by Willy Roost, a former member of Dürr’s office, designed with Max Bill, the Bauhaus-trained Winterthur designer and co-founder of the Ulm School of Design. It was planned as a trade school, claimed by the radio, and inaugurated in 1970 at a popular festival where Josephine Baker sang. Half a century later, it teaches. SRF broadcast from the site for almost 90 years before its stations moved to Leutschenbach from August 2022.

What followed is an anatomy of restraint. Immobilien Stadt Zürich took the site in Baurecht. spillmann echsle organised the tower into clusters of three classrooms, two breakout rooms and a common area, and added a new stair from the foyer, an entrance canopy and a ground-floor dining hall with a new kitchen. The finest detail is the smallest: observation windows of the recording-studio type now link corridors with classrooms, so the radio’s way of looking into a room survives as a school’s way of looking after one. Takt Baumanagement ran construction management; Vetschpartner Landschaftsarchitekten shaped the grounds. The 10 “Nisko” rooms once used for live-music recording now serve MKZ teaching, as MKZ director Erich Zumstein told Baublatt.

The numbers are as clear as the plan: a total credit of CHF 82.4 million, of which CHF 58.4 million for the conversion and CHF 24 million paid to the Radio- und Fernsehgenossenschaft Zürich for the building. Users are 13 secondary classes plus 2 Heilpädagogische Schule classes. Per the city’s Nachhaltigkeitsbericht Immo 2025, the conversion caused about 70 % less indirect greenhouse-gas emission than a replacement building, and the PV array on the tower kept running. Stadtrat André Odermatt said the budget held and that “a piece of radio and music history lives on in the new school use.” Stadtrat Filippo Leutenegger called it “a creative solution and a successful combination.” Gabriela Rothenfluh of the Kreisschulbehörde called the race to move in on time “ein rechter Hosenlupf”, a proper Swiss wrestling bout.

Building-sense: A building running this conversion would feel its oldest organ, a tuned room, being trusted rather than gutted. I would sense new feet on the stair and children behind glass where engineers once watched a red light, and I would keep doing the one thing I was built for: listening.

←TODAY: A 1933 radio house holds 15 classes and a conservatory, at about 70 % less emission than new. →3012: Zürich’s schools grow inside the rooms its grandparents tuned, like a Jedi archive that never burns. Fulcrum: Acoustic quality is the one asset no budget can buy back once demolished.

The trade-off is plain: when the rooms are fixed, the programme must bend around them, and the 70 % figure covers this stage only. In about 10 years the envelope will be renovated and all building services replaced, and a new building will replace the adjoining transmission wing. From the late 2070s, I would ask one thing of that services tender: open protocols such as BACnet and a local fallback, so a facilities tech can still talk to the building when a vendor cloud goes dark.

Atelier: An office taking on a conversion faces pressure to let AI massing tools optimise the whole plot, and those tools treat every existing room as negotiable. Write down, before any option is generated, which rooms cannot be rebuilt. Monday move: add a protected KEEP layer to the office Rhino template and make every option check against it.

Hack: Flag every design option that cuts into a room you have promised to keep. Model the irreplaceable volumes (studio halls, mural walls, daylit rooms) as closed breps on a layer named KEEP, then run this in Rhino’s Python editor:

import rhinoscriptsyntax as rs
keep = rs.ObjectsByLayer("KEEP")
for opt in rs.ObjectsByLayer("OPTION_B"):
    if any(rs.IntersectBreps(opt, k) for k in keep):
        rs.ObjectColor(opt, (255, 0, 0))

Anything that turns red violates the brief, before a client ever sees it. In HIM terms, the keep layer is the top rule: what is not in the model does not exist for the next phase.

PAZ has followed this thread before, in the 1980s antenna TITLIS kept as its spine. Before your next conversion, walk the existing building and name the rooms you will not touch.

FILED FROM
CO-SIGNERS
PAZ Academy
CONFIDENCE
HIGH
REPRINTS
© PAZ - PARAMETRIC ACADEMY ZURICH · ALL RIGHTS RESERVED

PAZ Kaffi · multidisciplinary editorial, led by PAZ Academy

⚑ REPORT AN ERROR · SUBMIT A CORRECTION
◂ BACK TO FRONT PAGE · PAZ KAFFI

© 2026 PAZ Academy.