CH NEO-ZÜRICH EDITION
WEATHER · OVERCAST 0°C
BLEND OF THE DAY · 07/ROGUE
EST. 2027
THE AEC CYBER MORNING NEWS

PAZ Kaffi

DESIGN · DEMOLITION · CAFFEINE · DISPATCH
EDITION 1128 · 28 November 2026
BROADCAST 04:42 CET
2,400 BROADSHEETS PRINTED
READ TIME · 47 MIN
Nomos wins Geneva's Bout-du-Monde by keeping the 1969 pavilion and cutting it in two
BÜRO
FRAME · 06:55
28-11-2026

Nomos wins Geneva's Bout-du-Monde by keeping the 1969 pavilion and cutting it in two

«Compas» by Nomos keeps Geneva's 1969 sports pavilion and splits it in two. What the Bout-du-Monde win teaches offices about reuse-first competitions.

The decisive move in the competition for one of the canton’s largest sports centres is a saw cut. «Compas», the winning entry for the Bout-du-Monde sports centre, keeps the existing sports pavilion (built in 1969, per the City brief) and splits it in two. Each half becomes one of the four quadrants of the plan, and two new buildings complete the set. As Marion Cruz Absi writes in her espazium/TRACÉS analysis of 5 November: «Le pavillon des sports, conservé, est scindé en deux pour former deux des quatre bâtiments du projet.»

The idea behind it is older than BIM. Lucius Burckhardt, the Swiss sociologist and planning theorist, argued for der kleinstmögliche Eingriff, the smallest possible intervention: change a system at its least invasive point and let the rest keep working. Céline Baumann, the winning team’s landscape architect, cited Burckhardt when describing the choice, as Cruz Absi reports. Jury president Christine Binswanger, in her words in the jury report quoted by espazium, wrote that the big architectural gesture was not the right answer «ici et maintenant». She also wrote that the jury only understood the project at the very end of three days of deliberation.

Read the City of Geneva’s brief of 2 February 2026 and the cut looks less like modesty and more like precision. The programme asks for an Olympic pool («Les piscines genevoises sont saturées»), multi-sport halls and an athletics hall. That adds up to 19,028 m² of usable area, with THPE performance for new buildings and a goal of energy autonomy from local, renewable, emission-free sources. Sport has to keep running during the works. The pavilion already holds about 5,765 m² of usable area. The brief attached a ReUse screening by Zirkular GmbH and left the choice to keep or replace «à l’appréciation des concurrentes et concurrents». Nomos took that opening. According to ATS, the athletics hall sits above the pool facing the Arve, around a circular central pavilion. A restaurant reuses existing elements. The project was initially estimated at over CHF 200 million.

The people behind it should be named. Nomos was founded in 2009 by Katrien Vertenten and Lucas Camponovo, with Ophélie Herranz and Paul Galindo as partners since 2019 and offices in Geneva and Madrid. The office describes its search as one for “opportunities within constraints”. It led a team with Inge Vinck Jan de Vylder Architecten (Ghent), Angélique Kuenzle (Geneva), Studio Céline Baumann (Basel), Co-struct (Lausanne), Societat Orgànica (Barcelona) and Tera-Inno (Thônex). Six more teams were ranked: Baukunst with Studio erde, FRES Architectes Lab with Atelier LIN, Bruther with Mosbach paysagistes, and the teams of Lacroix Chessex, Berrel Kräutler Architekten, and Sylla Widmann Architectes with Maren Kühn.

From our side of the desk, this is a lesson worth keeping. Draw the new volume first and measure the old building last, and by the time the existing areas are on the table, the concept is already committed to a cleared site. The trade-off is plain. A kept structure saves embodied carbon and keeps swimmers in the water during the works. It also fixes your grid, floor heights and phasing before the first sketch, and a competition team has days, not months, to price those constraints. PAZ has followed this thread before with Schmid Schärer’s Meggen pool, built into the hole already there. Councillor Marjorie de Chastonay said the project «répond aux besoins sportifs tout en se pliant aux impératifs de la durabilité». Asked whether this marks a new approach to public facilities, the City replied, as espazium reports, that it is «probablement trop tôt pour l’affirmer». That is an honest answer.

←TODAY: A CHF 200-million-class public brief in Geneva is won by keeping a 1969 pavilion. →3012: Every competition opens with a certified inventory of what already stands. Fulcrum: Doing as little as possible is only a design move once you have measured exactly what is already there.

Atelier: Offices that use AI to generate competition massing quickly face a quiet bias: the fast tools produce new volume, never an inventory of the old. Monday move: make “existing building as inventory” the first required layer set in your competition template, before any massing script runs.

Hack: Measure what you keep before you draw what you add. Trace the existing floor plates as planar surfaces on four sublayers in Rhino, then run this in the Python editor to get areas per decision:

import rhinoscriptsyntax as rs
for layer in ["KEEP", "SPLIT", "REUSE", "REMOVE"]:
    objs = rs.ObjectsByLayer("INVENTORY::" + layer) or []
    print(layer, round(sum(rs.Area(o) for o in objs)), "m2")

Compare the totals against the brief’s programme (19,028 m² here) and you can see the reuse share before anyone opens a massing study.

PAZ Takeaway: PAZ can set up this inventory as a reusable Rhino + Grasshopper template, with keep / split / reuse / remove layers and live area totals. Through the PAZ Grasshopper↔Archicad Library, those layers can then be carried into the Archicad execution model, so the reuse decision made in the competition survives into the Ausführungsplanung.

Open your next brief, find the existing building, and model it before you sketch anything new.

FILED FROM
CO-SIGNERS
PAZ Academy
CONFIDENCE
HIGH
REPRINTS
© PAZ - PARAMETRIC ACADEMY ZURICH · ALL RIGHTS RESERVED

PAZ Kaffi · multidisciplinary editorial, led by PAZ Academy

⚑ REPORT AN ERROR · SUBMIT A CORRECTION
◂ BACK TO FRONT PAGE · PAZ KAFFI

© 2026 PAZ Academy.