CH NEO-ZÜRICH EDITION
WEATHER · OVERCAST 6°C
BLEND OF THE DAY · 07/ROGUE
EST. 2027
THE AEC CYBER MORNING NEWS

PAZ Kaffi

DESIGN · DEMOLITION · CAFFEINE · DISPATCH
EDITION 1121 · 21 November 2026
BROADCAST 04:42 CET
2,400 BROADSHEETS PRINTED
READ TIME · 47 MIN
NODE 4F · JOIN New here? Get the 04:42 dispatch — free, every morning.

werk_zwoelf

28 RESULTS SORTED BY DATE
[BÜRO] 2026-11-18 WERK ZWOELF

Metron's new hires join, on day one, the foundation holding 60 % of the votes

How Metron, a 160-person Swiss planning office, has run since 1974 on a staff foundation holding 60 % of the votes, and what an office can learn from it.

CH
[BÜRO] 2026-11-14 WERK ZWOELF

Joud Beaudoin build Lausanne's Maison de la Louve from its own excavation

Lausanne's Maison de quartier de la Louve by Joud Beaudoin: pisé from its own excavation, hemp-lime walls, 2,400 bricks pressed by residents, CHF 9.5m.

CH
[BÜRO] 2026-11-11 WERK ZWOELF

Seven Names on the Door, 560 Pupils Through It: PENZISBETTINI's Double Swiss Arc Award

A Zürich office founded in 2017 built Baar's CHF 56.9 m timber school on a 3.80 m grid and won the first double Swiss Arc Award. What practices can learn.

CH
[BÜRO] 2026-10-31 WERK ZWOELF

Keep the roof, lose the steel: Allen + Crippa win Holcim's visitor workshop in Siggenthal

Allen + Crippa won Holcim's open SIA 142 competition in Siggenthal with «Holcim Lab»: a kept shed roof, re-used slabs and carbon-prestressed CPC concrete.

CH
[BÜRO] 2026-10-28 WERK ZWOELF

Rooms first: soppelsa architekten win Schwarzenburg's new Oberstufenzentrum with «Merel»

Zürich office soppelsa architekten wins Schwarzenburg's Oberstufenzentrum with «Merel»: 40 applicants, a unanimous jury, about CHF 20 million, move-in 2031.

CH
[BÜRO] 2026-10-24 WERK ZWOELF

Three doors into the model: what we let an agent touch after BIM-Edit and IFCMemoryBench

BIM-Edit and IFCMemoryBench measured LLM agents inside IFC models. A Zurich office turns 3.4 % and 32.4 % into a written model-access policy.

CH
[BÜRO] 2026-10-22 WERK ZWOELF

Schmid Schärer win Meggen's new pool by building into the hole already there

Schmid Schärer Architekten win Meggen's new indoor pool unanimously from 72 applicants, with a timber scheme built into the 1973 pool's existing excavation.

CH
[BÜRO] 2026-10-17 WERK ZWOELF

Gigon/Guyer in 2026: a Rotkreuz school win and a handbook that publishes the method

Gigon/Guyer won the Kantonsschule Rotkreuz competition in 2026 and published its CO2 handbook. Why a written competition method is what a practice repeats.

CH
[BÜRO] 2026-10-10 WERK ZWOELF

From Architekten to Architektur: the Zurich cooperative that named itself after the work

Zurich cooperative pool became pool Architektur in 2026. How a weekly all-partner crit and shared income kept 500+ projects going without a star name.

CH
[BÜRO] 2026-10-03 WERK ZWOELF

BKG Architekten at 75: A New Zürich Address and the 15–20 Question

Zürich's BKG Architekten, founded 1951, marks 75 years at a new address. Its jubilee text names 15–20 staff as the optimal size. What is right for yours?

CH

© 2026 PAZ Academy.