BAU
The Tower That Was Already There: TITLIS Turns a 1980s Antenna Into a Swiss Cross
At 3,020 m, Herzog & de Meuron kept a 1980s PTT antenna's rock anchorage, steel frame and tunnel, then added two glazed volumes in a Swiss cross.
The Bauhaus Vorkurs: The Six-Month Training Set That Taught Architects to See Before They Build
How the Bauhaus Vorkurs of Itten, Moholy-Nagy and Albers worked as a curriculum-first training set, and what it teaches Swiss offices adopting AI today.
The flight path drew the skyline: Kowloon Walled City, cyberpunk's real prototype
About 350 self-built towers, 33,000 people, no architect: how the Kai Tak flight path drew Kowloon Walled City, and what Swiss offices can learn.
Nine Centimetres Over the A1: Heinz Isler's Cloth-Found Shells at Deitingen Süd
Heinz Isler's 1968 shells at Deitingen Süd span 31 m with 9 cm of concrete, their form found with hanging cloth. A Solothurn monument since 2000.
Evolutionary Architecture: Whoever Writes the Fitness Function Designs the Building
From Frazer's 1995 manifesto to Galapagos and NSGA-II: how design by breeding works, where the fitness function holds the power, and how to audit it.
Miguel Fisac's Pagoda: A 16-Metre Square, Rotated, and the Straight Lines That Made Concrete Curve
How Miguel Fisac rotated a 16 m square into hyperbolic paraboloids, why his Madrid Pagoda still teaches, and a Grasshopper snippet to rebuild one face.
The Building That Packs Itself: Emilio Pérez Piñero’s «Teatro Ambulante» of 1961
In 1961 student Emilio Pérez Piñero won the UIA prize in London with a travelling theatre whose dome folds into a bundle of bars. See how the node works.
Blade Runner drew a retrofit and called it decay. The arithmetic says otherwise
Blade Runner's Los Angeles looks retrofitted because bolting onto old buildings was cheaper than rebuilding. PAZ on why the film's moral is inverted.
Torres Blancas: the concrete body that refused to be demolished
Sáenz de Oíza's 46-pillar monocoque tower in Madrid — 23,243 m² of concrete that couldn't be demolished. What its isotropic slabs teach a 2026 carbon desk.
The School That Knows Its Own End Date — Kantonsschule Stadelhofen's Dübendorf Modules
Kantonsschule Stadelhofen's Dübendorf branch — ~250 timber modules, Minergie-Eco, built in 15 months and detailed to come apart at the end of the 2030s.