BAU
Point Cloud Simplification: The Discipline of Honest Deletion
How rational decimation keeps a laser scan light and geometrically honest for scan-to-BIM — from Song & Feng curvature to GP-PCS, with a one-line Open3D check.
BIM Interoperability: the building is the hand-off, not the model
Why two ISO 16739-compliant IFC exports can describe two different buildings — and how to police the seam with ifcopenshell, ISO 19650 and openBIM discipline.
The building that became the exhibit: reading the Lucas Museum from inside its curved skin
The 28,000 m² Lucas Museum opens 22 Sept 2026 — a free-form MAD shell where Star Wars art, NURBS geometry and the building-OS share one coordinate system.
Digital Twin: the model that never stops listening
From NASA's 2010 definition to bridge and BIM twins — what a digital twin really is, why it holds, and the one scalar your office must name before calling it one.
A Roof Found, Not Drawn: What Munich's 1972 Tent Still Teaches My Generation
The Olympiastadion's cable roof was form-found, not designed — what equilibrium structures and TNA teach heritage smart buildings about listening to their own loads.
Industry Foundation Classes: the open schema that is also your exit clause
IFC (ISO 16739-1:2024) is not just a file format — it is the open, Creative-Commons schema that keeps your building's data yours. A PAZ foundation essay.
I closed my carbon books before my first desk arrived
Fisher & Paykel's Auckland mass-timber diagrid closed its carbon books at 1,089 t ahead — but 'ahead' holds under only one of three LCA conventions.
Generative architecture: you stop drawing the building and start authoring the machine that finds it
Generative architecture flips design: you write the constraints and let the solver find the form. From Stiny's shape grammars to ETH's Shea — a PAZ foundation.
The Floor That Kept Its Promise: ETH's Rippmann Floor System Goes Tower-Scale in Zug
CreaTower I: VAULTED AG's Rippmann Floor System reaches tower scale in Zug, a ribbed vault with about 47% less concrete CO₂ than a flat slab, fourteen years in the making.
openBIM Is a Procurement Decision — the Politics Hiding in Your File Format
openBIM is a governance choice about who owns your building's data for life. Test the vendor claim, write one IDS rule, and draft the exit clause first.